Profile PictureStrong Energy EV Charging
$9.95

EV Ready Cost - Highrise Residential Building (Real Case Study, 304 Units, 1984)

Add to cart

EV Ready Cost - Highrise Residential Building (Real Case Study, 304 Units, 1984)

$9.95

⚡ EV Ready Plan – Highrise Residential Building

Real Project | 304 Units | Built in 1984 | Full Cost Breakdown | Confidential Details Removed

This is a redacted version of a real EV Ready Plan prepared for a large multi-unit residential building with over 300 units and 500+ parking stalls.

Use this as a real-world reference to understand:

  • What it might cost to make your building EV-ready
  • What kind of infrastructure upgrades are typically required
  • What rebates are usually available
  • What charging strategies are used to avoid massive electrical upgrades

Whether you're a strata council, property manager, EV consultant, or electrical contractor — this case study gives you a true behind-the-scenes look at a successful EV Ready Plan.


✅ What’s Inside:

  • Cost breakdown for infrastructure and charging stations
  • Load-sharing strategy used to avoid service upgrades
  • Rebate opportunities summarized
  • Ownership and billing model
  • Plain formatting, no fluff, no branding
  • Provided for educational and planning purposes only

🎯 Who It’s For:

  • Property owners or councils considering EV upgrades
  • Consultants preparing rough estimates
  • Electricians or engineers working on building proposals
  • Anyone who wants to see what a real EV Ready Plan actually looks like


Use this case study to model your own plan, build confidence with stakeholders, or educate your clients.

Add to cart

A real EV Ready Plan for a 300+ unit building. Redacted for privacy. Full cost + rebate breakdown.

Size
2.73 KB
Length
2 pages