Profile PictureStrong Energy EV Charging
$9.95

EV Ready Cost - Highrise Residential Building (Real Case Study, 272 Units, 1996)

Add to cart

EV Ready Cost - Highrise Residential Building (Real Case Study, 272 Units, 1996)

$9.95

⚡ EV Ready Plan – 272-Unit Building (Built 1996)

Real Case Study | Full Cost Breakdown | Confidential Details Removed

This EV Ready Plan is based on a large residential complex with two towers, built in 1996, consisting of 272 units and 350 parking stalls.

Use this as a real-world reference to understand how older residential buildings can be retrofitted with modern EV charging infrastructure — without needing a major service upgrade.


✅ What You’ll Learn:

  • Infrastructure cost to make 272 units fully EV ready
  • Load-sharing strategy used to avoid service upgrades
  • Per-unit pricing and system design explained
  • Rebate opportunities that could offset up to $97,000
  • Common system features like billing, monitoring, and networking

🧠 What Makes This Special:

Most EV Ready Plans focus on new construction. This case study shows how a 27-year-old building tackled the transition — making it perfect for strata councils, consultants, and property managers with aging infrastructure.


🎯 Who This Is For:

  • Strata councils or property managers planning for EV charging
  • Consultants looking to benchmark their project designs
  • Electricians and installers quoting on multi-unit buildings
  • Anyone who wants to see what a real, modern EV Ready Plan looks like

Use this case study to model your own plan, build confidence with stakeholders, or educate your clients.

Add to cart

Real EV Ready Plan for a 1996 building with 272 units. Full cost, load, and rebate breakdown included.

Size
2.77 KB
Length
2 pages