EV Ready Cost - Highrise Residential Building (Real Case Study, 272 Units, 1996)
⚡ EV Ready Plan – 272-Unit Building (Built 1996)
Real Case Study | Full Cost Breakdown | Confidential Details Removed
This EV Ready Plan is based on a large residential complex with two towers, built in 1996, consisting of 272 units and 350 parking stalls.
Use this as a real-world reference to understand how older residential buildings can be retrofitted with modern EV charging infrastructure — without needing a major service upgrade.
✅ What You’ll Learn:
- Infrastructure cost to make 272 units fully EV ready
- Load-sharing strategy used to avoid service upgrades
- Per-unit pricing and system design explained
- Rebate opportunities that could offset up to $97,000
- Common system features like billing, monitoring, and networking
🧠 What Makes This Special:
Most EV Ready Plans focus on new construction. This case study shows how a 27-year-old building tackled the transition — making it perfect for strata councils, consultants, and property managers with aging infrastructure.
🎯 Who This Is For:
- Strata councils or property managers planning for EV charging
- Consultants looking to benchmark their project designs
- Electricians and installers quoting on multi-unit buildings
- Anyone who wants to see what a real, modern EV Ready Plan looks like
Use this case study to model your own plan, build confidence with stakeholders, or educate your clients.
Real EV Ready Plan for a 1996 building with 272 units. Full cost, load, and rebate breakdown included.