$9.95

EV Ready Cost - Highrise Residential Building (Real Case Study, 272 Units, 1996)

I want this!

EV Ready Cost - Highrise Residential Building (Real Case Study, 272 Units, 1996)

$9.95

⚡ EV Ready Plan – 272-Unit Building (Built 1996)

Real Case Study | Full Cost Breakdown | Confidential Details Removed

This EV Ready Plan is based on a large residential complex with two towers, built in 1996, consisting of 272 units and 350 parking stalls.

Use this as a real-world reference to understand how older residential buildings can be retrofitted with modern EV charging infrastructure — without needing a major service upgrade.


✅ What You’ll Learn:

  • Infrastructure cost to make 272 units fully EV ready
  • Load-sharing strategy used to avoid service upgrades
  • Per-unit pricing and system design explained
  • Rebate opportunities that could offset up to $97,000
  • Common system features like billing, monitoring, and networking

🧠 What Makes This Special:

Most EV Ready Plans focus on new construction. This case study shows how a 27-year-old building tackled the transition — making it perfect for strata councils, consultants, and property managers with aging infrastructure.


🎯 Who This Is For:

  • Strata councils or property managers planning for EV charging
  • Consultants looking to benchmark their project designs
  • Electricians and installers quoting on multi-unit buildings
  • Anyone who wants to see what a real, modern EV Ready Plan looks like

Use this case study to model your own plan, build confidence with stakeholders, or educate your clients.

I want this!

Real EV Ready Plan for a 1996 building with 272 units. Full cost, load, and rebate breakdown included.

Size
2.77 KB
Length
2 pages